Installation of 600mm GRP sewer including construction of 8 manholes
Leppington Pump Station Stage 1 and 2


Installation of 600mm GRP sewer including construction of 8 manholes
1800mm pump station spec built to DTC2201
12m inclusive of shoring
2km
Pump station excavation
Excavation with clam shell excavator
Construction of IMH (manholes)
Backfilling
Testing and commissioning