Involved working within a complex urban environment, managing multiple 56-hour shutdowns to connect from a substation to Central Train Station. The project also included NDD protection, live asset management, installation of joint bays, CAT pits, rock excavation, mandrelling and cable pulling.
Client: Sydney Metro
Location: Surry Hills, NSW
Services
Conduit & Cables, Deep Excavation, Electrical, NDD Excavation
Project Specifications
Pipe
33kv up top bank of 16 conduits 200mm
Depth
Ranging to 4m
Length
1.4km
Other
Multiple 56 hour shutdowns to complete works
Connecting from sub station to Central Train Station
NDD protection from existing assets
Working in amongst live assets
Installation of two joint bays, three CAT pits
Mandrelling and Cable Pulling